MARITIME MATTERS – April 2017

MARITIME MATTERS – April 2017


NEWTOWN
CREEK CAG

  • A meeting of the Full Newtown Creek Citizen’s Advisory Ctte (CAG) was held in Queens on the evening of 5 April 2017.
  • USEPA and DEP reported on their various studies including: Clean Water-Floatables; Long Term Combined Sewer Overflow controls; Human Risk Analyses; Ecological Risk Analyses; Remediation Evaluation Study.
  • Riverkeeper advised that they have received a grant to initiate a study to create a Vision for Newtown Creek that will address and include all facets of stakeholder input.
  • NYCEDC presented their Secondary Channel study which identified the critical economic importance of maritime-related industry located on NYC secondary channels, and how proper dredging plays an important role in keeping these channels open for commerce, and creating jobs.
  • Reviewed options regarding placards that will be positioned on NC to advise of contaminated seafood caught in the area.


ULCV Ready?

  • With the de-construction of the Bayonne Bridge proceeding smoothly, preparations to ensure that NY/NJ is ULCV ready continue apace.
  • All parties concur that final operating parameters will not be established until all proper considerations are made.
  • The last 2 classes at MITAGS are in the final stage after which the HOPs Deep Draft Working Group (DDWG) will review all simulation results/considerations, and make recommendations regarding operational requirements and procedures.
  • DDWG will coordinate with the USCG VTS to create initial operating guidelines.
  • PANYNJ will discuss with the Vessel Coordination Group including vessel operators and Marine Terminals.
  • USCG will initiate a Port Stakeholder meeting to discuss initial operating requirements and get stakeholder input. The meeting will be held May 16, with announcements being circulated to concerned parties.
  • Discussions will detail proposed operating guidelines including: # required pilots;# required tugs; definition of ULVCs; anchorage usage; traffic patterns;, impact on non-ULVC port operations; bunkering operations; weather constraints; tidal windows; potential for virtual ATONs due to restricted visibility; and others.